Support to electricity
Support to Electricity

Since 2014, CEF Energy has allocated over €5.1 billion to 85 electricity projects that are contributing to the modernisation and interconnection of Europe’s power grid. These investments aim to build cross-border interconnectors and developing offshore wind grids that allow EU countries to regain energy sovereignty, share surplus electricity, eliminate bottlenecks, and lower consumer prices.  Another major focus is modernising infrastructure through smart grids and energy storage facilities. This supports a more flexible and resilient power system by helping integrate the rapid growth of wind and solar energy while maintaining a stable electricity supply. It also strengthens system reliability and helps reduce the risk of outages. 

Ultimately, these projects aim to create a fully integrated, digitalised European energy market, enhancing the security of energy supply, removing dependencies on external power systems, and accelerating Europe's transition to a net-zero economy. 

CEF Energy co-funding has contributed to the expansion of the EU energy grid with 17,155 km of new electricity lines, allowing energy to flow both ways between Member States - including with neighbouring countries - helping to remove regional bottlenecks. Thanks to this expanded grid, Europe can now transmit an additional 107 GW of electricity and has increased its storage capacity to 2,831 GWh.

Flagship projects

CEF Energy - Celticinterconnector

The Celtic Interconnector will deliver a 575 km high-voltage direct current (HVDC) subsea link between Ireland and France that will connect their power grids creating the first connection of Ireland with the European mainland. The project has received support under the Connecting Europe Facility (CEF) Energy programme through two study, and one works grants.

During the construction phase, one of the most technically complex aspects is the submarine cable manufacturing and installation that depends on a range of factors, including weather conditions, seabed characteristics and vessel availability. Despite the challenges, implementation is progressing well. Onshore works are expected to be completed shortly while marine operations carried out in 2025 and 2026 have already enabled 180 km of submarine cable to be laid on the seabed.

Once commissioned, the Celtic Interconnector with a capacity of 700 MW will strengthen security of supply, support the electricity needs of up to 450 000 households, and contribute to more competitive prices and greater system flexibility, particularly as Ireland expands its offshore wind capacity.

EU contribution: €537.5 million

CEF Energy - Aurora Line

The Aurora Line interconnector is a 400 kV cross-border overhead transmission line stretching over 380 km between Sweden and Finland. The interconnector was commissioned in November 2025, ahead of time, despite significant technical, logistical and environmental challenges, which represents a remarkable achievement.

Two CEF Energy-funded actions drove the Aurora Line's implementation. They provided essential support for environmental impact assessments (EIAs), permitting, and engineering design, and co-financed the physical construction leading to the final commissioning of the interconnector

The completion of this interconnector delivers tangible benefits for the Nordic region and the EU internal energy market by enabling increased production and the balanced integration of renewable energy sources. By strengthening cross-border capacity and system flexibility, the Aurora Line makes a fundamental contribution to Europe’s transition towards a greener and more resilient energy system. Beyond the immediate region, the Aurora Line is of strategic relevance to the Baltic Energy Market Interconnection Plan (BEMIP) High-Level Group, helping to further integrate electricity markets across the Baltic Sea Region.

EU contribution: €130.7 million