
Located along the Mediterranean Core Network Corridor, a faster, more efficient rail link between Turin metropolitan area and Turin Airport in the Piedmont Region of Italy has been created thanks to CEF Transport co-funding.
At the heart of the project is a new railway link built underneath Corso Grosseto, one of Turin’s main avenues. The newly constructed 2 km long railway tunnel offers a direct, fast and high-quality rail connection between the city and the airport, offering passengers a seamless link between urban transport and long-distance air travel.
Since the new line started operating in late 2023, the impact has been substantial. In just six months, passenger numbers increased eightfold, demonstrating strong demand for a reliable, sustainable alternative to road transport. This rise comes at a time when Turin Airport is experiencing rapid growth, reaching 4.7 million passengers in 2024.
The project has significantly improved the passenger experience by creating a new underground stop at Corso Grosseto and modernising the existing Rebaudengo railway station. With Rebaudengo located on the Torino–Milano high-speed line, the upgraded infrastructure strengthens connections to the broader national and European transport networks. This integration ensures that the benefits extend far beyond the metropolitan area, improving mobility for regional and long-distance travellers.
By providing fast, direct access to the airport, encouraging a shift from road to rail, and improving regional connectivity, the project delivers long-lasting benefits for citizens, travellers and the local economy.
Beyond the transport benefits, the project has also had a major urban regeneration impact. Building the rail link underground made it possible to redesign the entire surface road network, creating new public spaces and improving the area’s accessibility and visual appeal.
By integrating transport upgrades with urban renewal, the project supports Torino’s vision for a more liveable, sustainable and well-connected city.
Last updated: November 2025
- Project duration
- 1 Mar 2020 - 31 Dec 2024
- Project locations
- turin, Italy
- Overall budget
- €74 000 000
- EU contribution
- €15 000 00020.3% of the overall budget